The Planning Inspectors have asked for 208 changes to Ealing's Local Plan before it can be adopted. Thirty-eight of them rewrite the Southall Town Plan, and a dozen borough-wide changes land hardest here. This page sets out what changes, where the weak points are, and what to say in a response.
Open until 5pm, Monday 21 December 2026. Every comment must name a Main Modification number (e.g. MM179).An independent residents' analysis of the council's published consultation documents, not advice from the council. Recommendations are our view of where a response is likely to count. Corrections are welcome.
9,413 of the 22,306 homes given indicative capacities across the borough's allocated sites (MM17).
Homes Southall can take on allocated and unallocated land, now written into paragraph 4.7.32 (MM141).
"Maximum height" becomes "appropriate height of up to", with "any deviation justified" (MM145 to MM167).
15,164 homes of supply against a requirement of exactly 15,164. No margin at all (MM208).
Homes forecast for 2030/31. The best year since 2019/20 delivered 1,994.
Roughly 29,000 to 37,000 more residents on top of about 81,000, from MM141's capacity. Our estimate.
Local biodiversity net gain falls to the national minimum (MM194).
The Plan says Southall has about 81,000 residents (paragraph 4.7.2). That matches the 2021 Census: 80,588 in Southall's six wards, 22% of the borough. MM141 adds net capacity for 12,455 more homes. At 2.3 to 3.0 people per new home, that is roughly 29,000 to 37,000 more people: a rise of 35% to 46%. The low end assumes typical London new-build flats. Southall's existing households are larger than that, so the true figure could be higher.
The Plan argues against itself here. Paragraph 4.7.13 says the spatial strategy "suggests moderate level of development" in Southall and that it "should be employment-led". The 2011 Opportunity Area designation expected 9,000 homes by 2041. The 12,455 figure is 38% higher than that, and it is added with no new evidence.
2011 Census: Southall's five wards at the time (69,857). 2021 Census: the six 2022 wards (80,588); boundaries changed in 2022, so the two counts are not exactly comparable. Planned: 80,588 plus 12,455 homes at 2.3 to 3.0 people each. Our estimate, not a council figure.
The Green Quarter (11SO) appears with three different housing numbers:
The original 2010 permission was for 3,750 homes, so the site has more than doubled. MM167 lowers the height from 18 to 16 storeys, but fewer storeys does not mean fewer homes. If the Plan counts 3,776, Southall's real capacity and population growth are higher than it shows.
Affordable housing by "habitable rooms". The permission sets affordable housing at 35% of habitable rooms, split 60% low-cost rent and 40% intermediate. Counting rooms instead of homes means nobody can say from the permission how many affordable homes there will be. The split is also below the Plan's own 70% social rent and 30% intermediate (Policy HOU).
2021 Census, households below the bedroom standard:
The Southall Town Plan does not mention overcrowding.
ONS Census 2021, table TS052 (occupancy rating for bedrooms), 2022 wards, via Nomis.
Table S1 lists the infrastructure for Southall's growth. Of its 19 schemes, 14 have delivery phasing "TBC", and only three have a date range: two health schemes and one sewer project. For school places and healthcare, the entry is "further work" to find out what is needed. The new open space at the Green Quarter has no named provider.
The Plan already admits "pressure on local services", deficient access to open space, and the second-highest deprivation of the seven towns (paragraphs 4.7.2 to 4.7.11). The modifications add homes without adding any delivery dates.
MM208 adds the October 2026 housing supply summary to the Plan. Net completions so far, and the council's forecast, against the London Plan target of 2,157 a year. The shaded years are the five-year supply period.
Source: Appendix D, Housing Supply Summary (October 2026), Table A3.1. 2024/25 is the reporting year. The cumulative shortfall to 2025/26 is 4,309 homes. The forecast for the five shaded years adds up to 15,164, exactly the requirement once the backlog and a 20% buffer are added.
How the books balance. The council spreads the 4,309-home shortfall over the whole plan period (the "Liverpool" method), so only 1,852 of it falls in the five years. Government guidance prefers making up a shortfall within five years where possible (the "Sedgefield" method). Done that way, the requirement is (10,785 + 4,309) × 1.2 = 18,113. Against that, the same supply is 84%, or about 4.2 years. The 20% buffer itself is the penalty for past under-delivery.
Is it realistic? Not on the record. The forecast needs more than 2,400 homes a year from next year and nearly 4,000 by 2030. In seven years the borough has never reached 2,000. Large Southall sites carry much of the forecast, and builders control when they build.
This is the last public stage before adoption. Responses go to the Inspectors, who decide whether each modification makes the Plan "sound". You can comment only on the Main Modifications and on the Integrated Impact Assessment (IIA) Addendum, including the Habitats Regulations Assessment screening. Points already made in 2024 have been considered and will not be reopened.
The Inspectors test each change against four questions. A comment that names one of them, explains why, and proposes replacement wording is far more likely to be acted on than a general objection.
Deleted text is struck through and new text is underlined. The plain-text versions most people copy from lose this, and the meaning flips. Here, the site's height was raised:
"Design analysis indicates a maximum height of 16 storeys (56 metres). Design analysis indicates an appropriate height of up to 18 storeys (63 metres)."
"Ensure building height, massing and street layout proposals are developed in accordance with guided by the Tall Buildings Strategy with any deviation justified."
Check it yourself. Open the Schedule of Main Modifications (or the Internet Archive copy) and go to PDF page 81. Every MM number in the table further down links to the page it is on. The council's convention is stated in the IIA Addendum, Appendix A: "Where text is to be deleted this is shown as crossed out and where new text is to be added, this is shown as underlined and in bold." Copying text out of the PDF loses that formatting, which is why it is easy to misread.
In priority order. Each one has a draft you can copy into the form and adapt. Responses in your own words carry more weight than identical text, so change the wording and add what you know about the site.
Indicative gross housing capacity for each site, as MM17 adds it to the Plan, with the heights after modification. The Monorep site (15SO) is deleted by MM172; the schedule keeps the old numbers for the sites after it.
| Site | Name | Homes | Height after MMs | MMs |
|---|
The 38 Southall Town Plan changes and the borough-wide changes that matter here, with our suggested stance.
| MM | Where | What changes | Stance |
|---|
MM179) and your comment. Up to ten boxes, then a
"further comments" box where you list the rest and label each comment with its MM.Comment on appendices through the MM that refers to them: Appendix D through MM208, Appendix B through MM204.
Email localplan@ealing.gov.uk
Subject line: Local Plan Main Modifications Consultation
Post: Strategic Planning Team, Ealing Council, 5th Floor, Perceval House, 14-16 Uxbridge Road, Ealing, W5 2HL
The same address handles requests for documents in other formats.
Fourteen files are published on the consultation page. Its download links carry an expiry stamp (?Expires=…, dated mid-December 2026), but tests on 14 November showed it is not enforced:
the same files download with the stamp changed to a past date, or with everything from the ? onwards removed. The links below use those plain addresses. Each document is also saved in the Internet Archive in case the platform changes, as is the consultation page. Two of the fourteen are byte-identical duplicates, so only twelve are listed.
The page also points to two examination documents for context: the Housing Land Position Statement (EB73D) and the Housing Trajectory Workbook (EB73C) (archived copies: EB73D page, EB73C page).